Lead Growth Marketer

San Francisco, CA (On-site)

$110K/yr – $180K/yrSenior Level3+ years expFull time

Posted 3 months ago

Job Summary

Own multi‑channel lead generation and funnel optimization with a data driven mindset.

  • Growth Infrastructure: own lead gen across SEO/GEO, site, email, LinkedIn, webinars, conferences, and paid channels, with conversion improvement at each funnel stage.
  • Campaigns & Events: design and run email/LinkedIn sequences, plan webinars, and lead pre/post event ROI analysis.
  • GTM Systems: build AI powered workflows so a small team can move as fast as a bigger one.

Job Description

Responsibilities

  • Own Lead Generation. Drive qualified leads across all channels — SEO/GEO, website, email, LinkedIn, webinars, conferences, and paid advertising — and continuously optimize conversion at every stage of the funnel.
  • Campaigns. Run email and LinkedIn campaigns that drive meetings and pipeline. Design the sequences, write the copy, measure the results.
  • Webinars. Plan and execute webinars as a lead generation channel, from topic selection to promotion to post-event follow-up.
  • Conferences. Manage conference strategy alongside the Field Marketing Manager, with responsibility for pre-event outreach and ROI analysis.
  • Paid Advertising. Work with our external partners or manage directly on paid campaigns, A/B message testing, and performance optimization.
  • Reporting. Build the dashboards that let us understand what's generating pipeline and what's not.
  • GTM Systems. Help build the workflows and AI-powered automations that let a small team operate at the pace of a much larger one.

Requirements

  • 3–5+ years of experience in a fast-paced B2B environment in a Growth, Demand Gen, or related Marketing role.
  • Demonstrated experience across at least two or more growth channels, including SEO/GEO, LinkedIn, email, events (webinars and conferences), paid search, and partner programs
  • A problem-solver who uses data. You break down complex problems, figure out how to crack them, and measure whether it worked.
  • Excellent written communication. You can write outreach copy, campaign messaging, and landing page content that converts.
  • Intellectual curiosity about AI and technology. You should be excited about learning our platform and talking about it credibly.
  • You move fast, ship work, and care about outcomes over process.

Preferred

  • Bonus if you have experience with Hubspot and healthcare/enterprise B2B. But what matters most is that you are sharp, high-energy, and relentless about generating results.

Benefits

  • Medical, dental, vision, 401(k), and PTO
  • San Francisco: Daily lunch provided in the office
Change Order logo

Change Order

Hosted by Jason Shuman of Primary Venture Partners, Change Order explores the turning points that define today’s leading operators and investors., , Guests like Ryan Serhant, Codie Sanchez, Michael Rudin, and James O’Shaughnessy share the key inflections that shaped who they are — and how they think.

1 employees

Salaries

Posted range

$110K/yr – $180K/yr

Taken straight from the job posting.

See all Change Order salaries

Marketing Team

Marketing Roles Posted (Last 30 Days)
8

Traffic Signals

Monthly Visitors
19.6K
Traffic Source Mix
Search
57.3%
Direct
34.7%
Referral
0.7%
Social
1.5%

Headcount Trend

Current headcount: ~1
Change Order logo

Lead Growth Marketer

Change Order · San Francisco, CA · On-site